Facebook Twitter Instagram
    Today’s Machining WorldToday’s Machining World
    • Swarfblog
    • Podcast
    • Industry News
    • Videos
    • About
    • Advertise
    • Back Issues
      • Editor’s Notes
      • Featured Stories
      • Forum
      • How it Works
      • Lloyd Graff’s Afterthought
      • Reviews
      • Shop Doc
      • Interviews
      • Magazine Back Issues
    • Subscribe
    • Contact
    Today’s Machining WorldToday’s Machining World
    Home»Swarfblog»Making parts faster doesn’t always mean cheaper
    Swarfblog

    Making parts faster doesn’t always mean cheaper

    Mark BosBy Mark BosMay 5, 2010Updated:January 21, 20141 Comment3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    By Mark Bos

    In today’s difficult economy, we are all trying to make parts faster and cheaper. Unfortunately, making parts faster is sometimes at odds with making them cheaper.

    I have learned from experience that sometimes a machine will consume less money if you slow it down a little and try to find the proverbial “sweet spot.” The fastest spindle speeds and the highest feed rates may not be the best way to run the machine. It may be difficult to convince your boss that this is true, but having real data to prove it can be helpful.

    Tooling costs or machine repair costs are examples of costs that could go up significantly if the machine is pushed too hard when trying to reduce cycle time. When I get involved in a process, I like to track tool life. If I don’t know what my tool life was before I make a change, I can’t accurately measure the performance gains or losses caused by the change. I always share my tool log results with the machine operator, as part of his or her involvement in the process improvement.

    The following is a good example of slowing a machine down to get better performance. The part was made on an Index ABC lathe. This machine was plunge-roughing the OD of a cylindrical part made of 8620 steel, using a .3” wide carbide insert-type OD roughing tool. The tool had problems with durability. The average tool life for this tool was little more than 200 hits per edge. When the edge went bad, it happened quickly and would cause problems for the finishing tool that followed it. This roughing tool is one of 11 tools used to make this part on this machine.

    The first thing I checked was feeds & speeds. The actual surface speed for the roughing tool was 1100 ft/min, while the recommended surface speed range, per the insert manufacture’s catalog, was 250 to 600ft/min. After reducing the spindle speed by 50 percent to obtain a more suitable surface speed, I steadily increased the plunge feed rate to a value 60 percent higher than it was. After these adjustments the chips curled up tightly, with a nice sizzle when they came off.

    The net effect of my changes on the cycle time was an increase in cycle time of less than 1 percent. I was lucky that I was nearly able to completely compensate for the decrease in surface speed by increasing the feed rate.

    The tool life results went from little more than 200 hits per edge, to more than 1200 hits per edge. This resulted in a $330 reduction in tooling costs per month. Additionally, we reduced tool change time by 15 minutes per week.

    This was a time where a slower cycle time actually enabled me to make similar quantities of parts per month and reduce tool usage costs. If someone forgot their machining 101 lessons, there may be room for improvement.

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Mark Bos

    Related Posts

    How to Talk to Anyone—Even If You Disagree

    June 2, 2025

    Apple’s Pickle

    May 30, 2025

    Precision Machining Class in Session, with Jared Daily-EP 207

    May 28, 2025

    What Men Hate to Talk About

    May 22, 2025

    1 Comment

    1. Kenny on October 16, 2010 9:50 pm

      If slowing the machine improves tool life and thus less change over, which ultimately yields the exact same productivity as opposed to increasing cycle time, then yes what you said makes sense.
      However, that is rarely the case in real world manufacturing. The factoring in of daily overhead cannot be overlooked, and if I can trim days off a production that is going to take several weeks, and that I have other jobs lining up, I will not hesitate to do so. Days lost = Business opportunity loss = Money.

    Graff Pinkert

    Join Email List

    Subscribe to the Swarfblog

    Lists*

    Facebook Twitter Instagram
    © 2025 Today's Machining World

    Type above and press Enter to search. Press Esc to cancel.